monthly chronology June

7.01 7.02 7.03 7.04

Deck finally being built

decking with Ipe (ironwood)

Scaffolding being put in place for deck

garage with leftover rigid insulation
7.06 7.08 7.07 7.09

living room after drywall, before finish carpenters

entry+living room

panorama from dining room after drywall

looking from stairway landing past dining room into kitchen and sunroom
7.10 7.11 7.13

looking up from stairway landing into study and master bd doorway

from study across stairwell

basement bathroom using leftover ceiling rigid insulation

monthly chronology June